The Anna swimming pool is located opposite the clock tower building of the University of Madras and virtually remains hidden behind the Anna Square bus terminus. The pool is said to be the first Olympic size pool to be built in Tamil Nadu. It was constructed in 1976 with a diving board. However, the diving board was removed later during a renovation. The pool is 4 to 11 feet (1.2 to 3.4 m) deep. It also has a toddler pool that is 2.5 feet (0.76 m). Sports Development Authority of Tamil Nadu (SDAT) conducts regular coaching camps at the pool.
Saturday, September 20, 2014
The Anna swimming pool
The Anna swimming pool is located opposite the clock tower building of the University of Madras and virtually remains hidden behind the Anna Square bus terminus. The pool is said to be the first Olympic size pool to be built in Tamil Nadu. It was constructed in 1976 with a diving board. However, the diving board was removed later during a renovation. The pool is 4 to 11 feet (1.2 to 3.4 m) deep. It also has a toddler pool that is 2.5 feet (0.76 m). Sports Development Authority of Tamil Nadu (SDAT) conducts regular coaching camps at the pool.
Friday, September 19, 2014
Sunday, September 7, 2014
Ganesh Chaturthi Idol Immersion Processions in Chennai pattinapakkam On 07-09-2014
Tuesday, September 2, 2014
Subscribe to:
Posts (Atom)